How we select sites, coordinate infrastructure, and work with the communities around them.
01Power first
We start with the power.
We begin with grid access and the path to energization, assessing available power alongside site conditions and delivery requirements.
02Supplier-led infrastructure
Specialist systems. Coordinated delivery.
We work with specialist suppliers of factory-integrated modules, coordinating their equipment with site preparation, power, and cooling.
Reference configuration; final specifications vary by project and supplier.
- Pod capacity
- 200 kW
- Per factory-integrated module.
- Assembly capacity
- 3 MW
- Maximum per coupled assembly.
- Rack format
- 4 × 52U
- Per pod. Liquid-cooled, built for high-density AI racks.
- Distribution
- 415 VAC / 800 VDC
- Dual distribution architecture.
Cooling
Pods are liquid-cooled, built for high-density AI racks, with a design PUE of 1.15 — a design target, not achieved performance. Cooling is intended to avoid ongoing evaporative water consumption.
Power
The reference configuration uses 2N 5000A switchgear with quad 1200A busways. The redundant topology is designed to allow maintenance and fault isolation.
Air handling
Three-stage MERV filtration protects the IT space from particulate ingress, with pressure-monitored filter stages — relevant at the rural sites where grid capacity is available.
Supplier manufacture
Suppliers assemble, wire and test pods on a controlled production line before shipping. Site preparation, power and cooling work is coordinated alongside that delivery.
03Community and stakeholders
Development shaped by its surroundings.
Community engagement is part of site planning and project delivery. We work to understand local priorities and address them as the design develops.
Who we work with
Neighbors
The people who live and farm near our sites.
Local government
County officials, planning and zoning boards.
The utility
The company that serves the site and the wider community.
Landowners
The families and businesses whose land hosts the project.
First responders
Local fire and emergency services.
Our commitments
- 01
Early engagement. We meet with local officials and neighbors before we seek permits.
- 02
Clear information. We share the project's scale, expected noise and the construction schedule in plain terms.
- 03
An accessible project contact. Every project has one person the community can reach directly.
- 04
Design that considers local concerns. We plan around noise, construction traffic and visual impact, and take feedback into the design.
- 05
Water-conscious cooling. Cooling is intended to avoid ongoing evaporative water consumption.
If you live near one of our projects or represent a community we work in, we want to hear from you.