01Location and site context
Power at the boundary.
An existing transmission-connected substation stands at the site boundary. The Phase 1 pad is being graded and the access road is built.


02Planned infrastructure
Specifications as currently planned.
- Grid power
- 7 MW permitted utility service.
- Deployment
- Supplier-provided modular infrastructure for tenant-owned hardware.
- Cooling
- Liquid cooling for high-density AI racks.
- Design efficiency
- Target PUE of 1.15 — a design target, not achieved performance.
- Cooling water
- Designed without ongoing evaporative cooling-water consumption.
- Expansion
- Up to 21 MW total site potential, subject to further development and permitting.
Critical IT capacity and detailed specifications are discussed in a technical briefing. Power is billed on a pass-through basis.
The campus is planned around power that already exists at the site and a cooling design intended to avoid ongoing cooling-water consumption.
03Development progress
Where Phase 1 stands.
- Site securedComplete
- Phase 1 permitted utility serviceComplete
- Site preparationGrading underway
- Module deliveryUpcoming
- EnergizationTarget Q4 2027
Acreward Infrastructure is the developer of Eldora, with Digital Shovel as technology partner.
Discuss capacity at Eldora.
Tell us the capacity you need, your rack requirements and your timing.