A modular AI campus planned around existing power infrastructure in Hardin County, Iowa.

In development

Key facts

7 MW
Phase 1 permitted utility service
Q4 2027
Target energization
Grading underway
Current activity
Up to 21 MW
Potential site capacitySubject to further development and permitting.

01Location and site context

Power at the boundary.

An existing transmission-connected substation stands at the site boundary. The Phase 1 pad is being graded and the access road is built.

The existing transmission-connected substation at the Eldora site boundary
Existing substation — site photography
Grading in progress on the Eldora site, with the substation visible beyond
Site grading — site photography
Existing substationPlanned campus modulesSite access
Conceptual site relationships — not a surveyed site plan

02Planned infrastructure

Specifications as currently planned.

Grid power
7 MW permitted utility service.
Deployment
Supplier-provided modular infrastructure for tenant-owned hardware.
Cooling
Liquid cooling for high-density AI racks.
Design efficiency
Target PUE of 1.15 — a design target, not achieved performance.
Cooling water
Designed without ongoing evaporative cooling-water consumption.
Expansion
Up to 21 MW total site potential, subject to further development and permitting.

Critical IT capacity and detailed specifications are discussed in a technical briefing. Power is billed on a pass-through basis.

The campus is planned around power that already exists at the site and a cooling design intended to avoid ongoing cooling-water consumption.

03Development progress

Where Phase 1 stands.

  1. Site securedComplete
  2. Phase 1 permitted utility serviceComplete
  3. Site preparationGrading underway
  4. Module deliveryUpcoming
  5. EnergizationTarget Q4 2027

Acreward Infrastructure is the developer of Eldora, with Digital Shovel as technology partner.

Discuss capacity at Eldora.

Tell us the capacity you need, your rack requirements and your timing.